Follett HCD1400R Manuale Utente Pagina 21

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 20
21
Fig. 22
11. Reconnect transport tube to louvered
docking assembly.
12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing
as shown.
Apply
petrol-gel
Fig. 23
14. Apply a coat of petrol-gel compound to the auger
shaft.
15. Install gearmotor, making sure that insulation is
properly seated between gearmotor and main
housing as shown.
16. Firmly tighten four gearmotor bolts in place.
17. Insert a bolt into the auger shaft and finger tighten.
removed for clarity
Note: Shuttle housing
Fig. 21
6. Orient auger shaft with keyway in the
upward position.
7. Force main housing into position against evaporator
and place 1/4" (7mm) diameter Phillips screwdriver
into hole in the auger shaft.
8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.
Vedere la pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 39 40

Commenti su questo manuale

Nessun commento